Skip to content

KNOCK DOWN REBUILD

Stay close to your work, schools, neighbours, and local lifestyle with a knock down rebuild in Sydney

Finding a vacant block of land in Sydney can be a real challenge. The good news is that if you want (or need) to live closer to the city, there's an affordable solution here at Montgomery Homes: a knock down rebuild project.

Modern white single-story house with gabled roof, front porch with columns, garage, concrete driveway, and landscaped garden with young plants and shrubs under blue sky.

Learn more about the knock down rebuild costs and process, and chat with one of our knock down rebuild specialists today

Once you have decided to knock down your current house, Montgomery Homes will guide you through the entire building process step-by-step to reduce the risk of the rebuild becoming stressful. Here is a summary of the knockdown rebuild process:

  1. Inspector in high-visibility safety vest holding a tablet and stylus, conducting a site inspection outdoors with a building window visible in the background.

    Our construction team will visit your property for a free in-depth site analysis, including an assessment of the existing structure.

  2. Architectural floor plans showing multiple residential units with room layouts, fixtures, and measurements drawn on a grid background in black and white.

    We’ll present you with a detailed tender covering all the costs to build your dream home. Once approved, we invite you to pay your commencement fee, and our talented drafting team will start drawing your plans. Now is a great time to start organising demolition quotes for your current home.

  3. Person signing a contract document with a pen, holding the paperwork with one hand while writing with the other.

    On acceptance of your Lodgement Plans, our Contracts Administrators will prepare your HIA building contract. At this time, your 5% deposit is paid.

  4. Two people reviewing interior design material selections laid out on a concrete surface, including fabric swatches, color palette fan, wood samples, and black and white material samples arranged in an organized grid layout.

    Select your internal and external colours, features and finishes with our Interior Designers.

  5. Red pushpin marking date 26 on a calendar page, representing a scheduled demolition date.

    Once your DA / CDC has been approved, the demolition of your current house can be scheduled.

  6. Yellow demolition excavator with claw attachment processing concrete and debris at a demolition site, with crushed rubble and broken concrete pieces scattered across the ground under clear blue sky.

    Demolition can take up to four weeks to complete. At this time, we will obtain the construction certificate for your new home (if applicable) and prepare the final construction documents.

  7. Yellow excavator dumping soil from its bucket during site preparation work, with dust billowing in the air and the machine's cab visible on the right side of the image.

    Once demolition is complete, arrange and undertake correct site preparation on your block & provide proof of funds.

  8. Construction site with concrete foundation being poured using a green pump truck with extended boom. Workers in high-visibility vests oversee the operation on a dirt lot surrounded by metal fencing, existing buildings, and trees under partly cloudy sky.

    The construction process commences on your beautiful new home.

  9. Two people unpacking cardboard moving boxes in an empty room, with one person's hand resting on a box in the foreground.

    Move in!

Inspector in high-visibility safety vest holding a tablet and stylus, conducting a site inspection outdoors with a building window visible in the background.

Step 1

Free Site Inspection

Our construction team will visit your property for a free in-depth site analysis, including an assessment of the existing structure.

Architectural floor plans showing multiple residential units with room layouts, fixtures, and measurements drawn on a grid background in black and white.

Step 2

Tender & Drafting Preparation

We’ll present you with a detailed tender covering all the costs to build your dream home. Once approved, we invite you to pay your commencement fee, and our talented drafting team will start drawing your plans. Now is a great time to start organising demolition quotes for your current home.

Person signing a contract document with a pen, holding the paperwork with one hand while writing with the other.

Step 3

Contracts & Deposit

On acceptance of your Lodgement Plans, our Contracts Administrators will prepare your HIA building contract. At this time, your 5% deposit is paid.

Two people reviewing interior design material selections laid out on a concrete surface, including fabric swatches, color palette fan, wood samples, and black and white material samples arranged in an organized grid layout.

Step 4

Colours, Features & Finishes Selection

Select your internal and external colours, features and finishes with our Interior Designers.

Red pushpin marking date 26 on a calendar page, representing a scheduled demolition date.

Step 5

Demolition Scheduling

Once your DA / CDC has been approved, the demolition of your current house can be scheduled.

Yellow demolition excavator with claw attachment processing concrete and debris at a demolition site, with crushed rubble and broken concrete pieces scattered across the ground under clear blue sky.

Step 6

Demolition & Construction Preparation

Demolition can take up to four weeks to complete. At this time, we will obtain the construction certificate for your new home (if applicable) and prepare the final construction documents.

Yellow excavator dumping soil from its bucket during site preparation work, with dust billowing in the air and the machine's cab visible on the right side of the image.

Step 7

Site Preparation & Finance Confirmation

Once demolition is complete, arrange and undertake correct site preparation on your block & provide proof of funds.

Construction site with concrete foundation being poured using a green pump truck with extended boom. Workers in high-visibility vests oversee the operation on a dirt lot surrounded by metal fencing, existing buildings, and trees under partly cloudy sky.

Step 8

Construction Begins

The construction process commences on your beautiful new home.

Two people unpacking cardboard moving boxes in an empty room, with one person's hand resting on a box in the foreground.

Step 9

Move Into Your New Home

Move in!

Live closer to the CBD. Consider a knock down rebuild in Sydney!

Rather than moving house or away from the city, you can simply knock down your existing house and rebuild a place to call home. Once your existing home has been demolished, our knock down rebuild specialists will prepare the block for the project and build your dream home a stone’s throw away from work, school and all the exciting opportunities Sydney offers.

We have completed hundreds of successful knock down rebuilds in Sydney, transforming outdated houses into contemporary architectural homes. We can do the same for you! Contact us for more information about a knock down rebuild in Sydney.

It all starts with a free site inspection

A knock down rebuild in Sydney doesn’t have to be stressful or challenging. At Montgomery Homes, we’re committed to making the building process simple and convenient so you can focus on more important things… like moving into your new home!

The building process starts with a free design consultation and site inspection at your current location. Our team will complete an in-depth assessment of your site conditions to determine the following: 

  • The most suitable designs for the block

  • The fall across your block

  • The location of trees

  • Neighbouring properties

  • Site accessibility

  • Any additional site preparation that may be required. 

Afterwards, we will provide a detailed tender covering all the potential costs required for a Sydney knock down rebuild.

Modern two-story gray and white house with illuminated windows, white garage door, metal roof, concrete driveway, and landscaping in front during dusk in a Sydney residential area.
Modern kitchen with light wood cabinetry, white countertops, and stainless steel appliances. Features an arched niche with shelving on the back wall, island bench with seating, pendant lighting, and wooden flooring throughout.

The benefits of a knock down rebuild in Sydney

Love where you live, but don’t love your home design? Whether you need more space for a growing family or simply think your design is outdated, a knock down rebuild in Sydney is the perfect solution. 

A knock down rebuild project comes with a lot of attractive benefits: 

  • You can stay in your current location where you’ve created precious memories

  • You don’t have to worry about meeting new neighbours

  • Your kids can stay at the same school with their friends

  • You can save money per square metre compared to a renovation project

  • You can go green and create a more eco-friendly home, all while reducing maintenance and energy costs

  • You can increase the value of your house and land

  • You won’t have to pay real estate fees or stamp duty fees!

How much does a knock down rebuild cost in Sydney?

Many NSW knock down rebuild projects use an indicative rebuild range of around $2,100 to $2,600 per m². These figures are a guide only, not a fixed quote.

You also need to factor in demolition costs in Sydney, which typically range from $20,000 to $40,000, depending on the existing home, site access, materials, and whether asbestos removal is required. 

Ultimately, your final costs can change based on: 

  • Size of the new home

  • Single-storey, two-storey or split-level design

  • Slope, soil conditions, rock and excavation needs

  • Site access for demolition, trucks and trades

  • Asbestos, old footings, pools, trees, roots or buried materials

  • Retaining walls, drainage, stormwater and service connections

  • Council requirements, permits and approvals

  • Facade, inclusions, finishes and upgrades

  • Temporary accommodation and storage during the build

The next best step is to book a free site inspection, so we can assess the block and provide a clearer view of likely site preparation and rebuild costs. All costs are factored into your detailed home pricing, so there are no hidden costs or surprises along the way!

Modern bedroom with neutral beige and gray tones, featuring a bed with cream bedding and decorative pillows, floor-to-ceiling sheer curtains covering large windows, a round wall mirror above a dark wooden nightstand, recessed ceiling lights, and neutral carpeting.
Construction worker wearing yellow hard hat and high-visibility vest inspecting drywall with clipboard and pen, representing quality assurance and warranty inspection on a job site.

After-handover support and termite protection

Your new Montgomery Home is protected by NSW statutory warranties, which generally cover major defects for six years and other defects for two years from completion.

Your home also includes termite-resistant T2 Blue seasonal pine timber wall frames and roof trusses, backed by a 25-year manufacturer’s guarantee against structural termite damage. Check your contract and inclusions to confirm what applies to your build.

After handover, we encourage you to report any concerns early. Send us clear details, photos, and relevant documents so the team can review the issue and advise on the next step in the aftercare process.

We want to ensure you’re 100% happy and moving into your dream home!

Your knock down rebuild FAQs answered

Demolition needs to be arranged by the owner and this process can take up to four weeks to complete. While demolition takes place, Montgomery Homes will obtain the construction certificate for your new home and prepare the final documents for your new home build. Make sure to find a licensed and insured demolition contractor to facilitate the demolition of your current house and to remove all the relevant materials, debris, trees, and roots. If required, we can suggest demolition companies in Newcastle, Hunter, Central Coast, and Sydney regions.

There’s a lot involved in preparing the site for a new home build. Therefore, it’s important to consult a new home builder before demolition commences. Once you have researched and engaged a demolition company to knock down your house, there are several items required to get the site ready, such as the removal of building materials, trees and roots, existing pools, and capping off the sewer. For more information, ask us about our knock down rebuilt fact sheet. We’ll guide you through the whole process.

At Montgomery Homes we understand that building a new home is an exciting life milestone, and we build every home as if it were our own — ensuring quality from the inside out. The timeframe for building a new home varies according to a number of factors including, but not limited to— the home design selected (single-storey vs double-storey or split-level), the individual specifications of the block of land (including site accessibility and condition), and external approvals (such as local council and BASIX). Behind every Montgomery Homes build is a team who are passionate about seeing your dream home come to life. Please get in touch with our team to enquire about the build timeline for your new home.

Site costs will vary from property to property. It all starts with a free site inspection — our team will complete a thorough review of the site and determine how much excavation will be required, whether there are trees and rocks on-site that need to be removed, whether there are any buried challenges we need to consider, and more. After completing the site inspection, we will provide an itemised list of site costs, all of which will be rolled into one tender.

Progress payments are staged payments made at key points during your build. Your lender will usually release each payment once the relevant construction stage is complete and any required checks have been carried out. This helps align your finances with the building timeline and gives you a clearer view of when payments are due.

Building approval timeframes can change based on: 

  • Whether your project qualifies for CDC or needs a DA

  • Your local Sydney council requirements

  • Site slope, access, drainage and stormwater needs

  • Heritage, flood, bushfire or easement restrictions

  • Neighbouring properties and setback requirements

  • Whether demolition approval is lodged separately

  • How quickly required reports and documents are provided

Our team will keep you informed throughout the entire process, so you’re never unsure about the progress of your project.

While some builders limit you to certain home designs and parameters, Montgomery Homes provides you with the freedom to build the kind of home that specifically caters to the way your family lives. We provide a broad range of customisable, architecturally-designed home designs to suit your block no matter its size, angle, or location.

Absolutely. In fact, a brand new home in an established suburb should have a higher rate of appreciation and will be an attractive prospect for potential buyers or renters if you ever choose to sell or rent it out.

Most Australian homeowners strive to increase the value of their largest asset and gain more equity in their home. In recent years, land prices have increased considerably and made it more attractive to stay put and enhance the home in your existing location than find purchase another home or new block of land. If your home is aging and you are looking to increase its value, there are two options: you can either undertake an extensive renovation or knock down and rebuild on your existing site. If you’re considering making structural changes to an existing property, costs can vary considerably. A major renovation can end up costing more than double per square metre when compared to a knock down rebuild. Renovations run the risk of over-capitalising and going over your budget. If you choose a knock down and rebuild project with Montgomery Homes, on the other hand, you will be given a detailed and transparent price at the very beginning to avoid unpleasant costs and surprises along the way. This means you can spend less time wondering how much everything is going to cost and more time daydreaming about the fun stuff like colours and home decor. Some people get frustrated searching for a home in a good neighbourhood. It can be stressful trying to find a home for the right price and sometimes it makes more sense to keep your current neighbours and rebuild on your site. Consider the resale value and what’s going to get you more bang for your buck.

On average, a major renovation is more than double the cost of a knock down rebuild per square metre. The cost to have your house demolished can differ depending on the size of the house, volume of material, if asbestos needs to be removed, and if there are any established trees or pools on the property. On average, the cost to demolish your house can range between $20,000 - $30,000. The knock down rebuild cost for your new home will vary depending on the type of home you build, the size of your home, whether it’s a split level home, and any additional upgrades you choose. At Montgomery Homes, we provide a free tender quote so you will know all knock down rebuild costs upfront before making a decision. Clients who have completed a knock down and rebuild with Montgomery Homes have said it was the best decision they have made financially. Ask us about putting you in touch with recent knock down rebuild clients to hear their experience firsthand.

Many homeowners use a construction loan for a knock down rebuild. This type of loan usually releases funds in stages as your new home is built, rather than as one upfront payment. It’s best to speak with your lender or broker early so you understand your borrowing capacity, deposit requirements, approval timing and how your loan will work once demolition and construction begin.

It depends on your lender, loan structure and building contract. Some demolition, service disconnection and site preparation costs may need to be paid before construction loan drawdowns begin. Confirm this early with your preferred demolition company and lender or broker so you can plan your budget and avoid delays between demolition and the start of your new home build.

Many Sydney blocks are suitable for a knock down rebuild, but every site needs to be assessed before you commit. The size, shape, slope, access and planning controls on your land can all affect what can be built.

Your block may be suitable if:

  • The existing home can be safely demolished

  • The block has enough width and depth for your preferred home design

  • The site allows safe access for demolition and construction

  • The slope can be managed with the right home design

  • Stormwater, sewer and service connections can be planned properly

  • Trees, pools, retaining walls or old structures can be assessed

  • Easements, setbacks and council requirements have been checked

  • The block suits your budget, lifestyle and long-term plans

A site inspection is the best place to start. Montgomery Homes can assess your Sydney block and help you understand which home designs may suit your land.

A knock down rebuild in Sydney will usually need approval through either a Development Application (DA) or a Complying Development Certificate (CDC).

  • A DA is assessed by your local council. This pathway is often needed when your new home requires a more detailed planning review, or when the design does not meet CDC requirements.

  • A CDC is a faster approval pathway for straightforward projects that meet set NSW planning standards. It combines planning and construction approval and can be assessed by the council or an accredited certifier.

As a guide, CDC approvals can be issued in as little as 20 days when all requirements are met. DA timeframes can vary depending on your council, site conditions, design complexity and whether extra information is requested.

Montgomery Homes will take care of the approval process for your new home. All you need to do is confirm how demolition approval will be handled, as it may require a separate approval or be included as part of the broader application.

We offer our knock down rebuild services throughout Sydney, from the Northern Beaches to the CBD and even as far west as the Blue Mountains and south to Wollongong and the Illawarra. We also offer services in Newcastle, the Hunter Valley, and the Central Coast!

The right home design will depend on the size and slope of the land. For example, if you have a narrow block, our team will recommend designs from our narrow home design collection. Likewise, if land has a challenging slope, we might recommend a split-level home design to make the most of the land. We’ll help you choose the right home design for the unique challenges of your property. You can choose the facade theme, the internal and external colours, and more! We’ll be with you through the entire process, so you can rest assured knowing you’ll receive the brand new home you’ve been dreaming of.

Building Process

Who will demolish my house?

Demolition needs to be arranged by the owner and this process can take up to four weeks to complete. While demolition takes place, Montgomery Homes will obtain the construction certificate for your new home and prepare the final documents for your new home build. Make sure to find a licensed and insured demolition contractor to facilitate the demolition of your current house and to remove all the relevant materials, debris, trees, and roots. If required, we can suggest demolition companies in Newcastle, Hunter, Central Coast, and Sydney regions.

Do I need to talk to a builder before I start demolition?

There’s a lot involved in preparing the site for a new home build. Therefore, it’s important to consult a new home builder before demolition commences. Once you have researched and engaged a demolition company to knock down your house, there are several items required to get the site ready, such as the removal of building materials, trees and roots, existing pools, and capping off the sewer. For more information, ask us about our knock down rebuilt fact sheet. We’ll guide you through the whole process.

How long does it take to Knock Down and Rebuild?

At Montgomery Homes we understand that building a new home is an exciting life milestone, and we build every home as if it were our own — ensuring quality from the inside out. The timeframe for building a new home varies according to a number of factors including, but not limited to— the home design selected (single-storey vs double-storey or split-level), the individual specifications of the block of land (including site accessibility and condition), and external approvals (such as local council and BASIX). Behind every Montgomery Homes build is a team who are passionate about seeing your dream home come to life. Please get in touch with our team to enquire about the build timeline for your new home.

What kind of site costs can I expect?

Site costs will vary from property to property. It all starts with a free site inspection — our team will complete a thorough review of the site and determine how much excavation will be required, whether there are trees and rocks on-site that need to be removed, whether there are any buried challenges we need to consider, and more. After completing the site inspection, we will provide an itemised list of site costs, all of which will be rolled into one tender.

How do progress payments work during construction?

Progress payments are staged payments made at key points during your build. Your lender will usually release each payment once the relevant construction stage is complete and any required checks have been carried out. This helps align your finances with the building timeline and gives you a clearer view of when payments are due.

What can affect approval timeframes?

Building approval timeframes can change based on: 

  • Whether your project qualifies for CDC or needs a DA

  • Your local Sydney council requirements

  • Site slope, access, drainage and stormwater needs

  • Heritage, flood, bushfire or easement restrictions

  • Neighbouring properties and setback requirements

  • Whether demolition approval is lodged separately

  • How quickly required reports and documents are provided

Our team will keep you informed throughout the entire process, so you’re never unsure about the progress of your project.

Home Designs

Can I make changes to your floorplans?

While some builders limit you to certain home designs and parameters, Montgomery Homes provides you with the freedom to build the kind of home that specifically caters to the way your family lives. We provide a broad range of customisable, architecturally-designed home designs to suit your block no matter its size, angle, or location.

Will my new home increase the value of my property?

Absolutely. In fact, a brand new home in an established suburb should have a higher rate of appreciation and will be an attractive prospect for potential buyers or renters if you ever choose to sell or rent it out.

Knock Down Rebuild

What are the pros and cons of a knock down rebuild vs a renovation?

Most Australian homeowners strive to increase the value of their largest asset and gain more equity in their home. In recent years, land prices have increased considerably and made it more attractive to stay put and enhance the home in your existing location than find purchase another home or new block of land. If your home is aging and you are looking to increase its value, there are two options: you can either undertake an extensive renovation or knock down and rebuild on your existing site. If you’re considering making structural changes to an existing property, costs can vary considerably. A major renovation can end up costing more than double per square metre when compared to a knock down rebuild. Renovations run the risk of over-capitalising and going over your budget. If you choose a knock down and rebuild project with Montgomery Homes, on the other hand, you will be given a detailed and transparent price at the very beginning to avoid unpleasant costs and surprises along the way. This means you can spend less time wondering how much everything is going to cost and more time daydreaming about the fun stuff like colours and home decor. Some people get frustrated searching for a home in a good neighbourhood. It can be stressful trying to find a home for the right price and sometimes it makes more sense to keep your current neighbours and rebuild on your site. Consider the resale value and what’s going to get you more bang for your buck.

What are the knock down rebuild costs?

On average, a major renovation is more than double the cost of a knock down rebuild per square metre. The cost to have your house demolished can differ depending on the size of the house, volume of material, if asbestos needs to be removed, and if there are any established trees or pools on the property. On average, the cost to demolish your house can range between $20,000 - $30,000. The knock down rebuild cost for your new home will vary depending on the type of home you build, the size of your home, whether it’s a split level home, and any additional upgrades you choose. At Montgomery Homes, we provide a free tender quote so you will know all knock down rebuild costs upfront before making a decision. Clients who have completed a knock down and rebuild with Montgomery Homes have said it was the best decision they have made financially. Ask us about putting you in touch with recent knock down rebuild clients to hear their experience firsthand.

Can I use a construction loan for a knock down rebuild?

Many homeowners use a construction loan for a knock down rebuild. This type of loan usually releases funds in stages as your new home is built, rather than as one upfront payment. It’s best to speak with your lender or broker early so you understand your borrowing capacity, deposit requirements, approval timing and how your loan will work once demolition and construction begin.

Can demolition costs be included in my knock down rebuild finance?

It depends on your lender, loan structure and building contract. Some demolition, service disconnection and site preparation costs may need to be paid before construction loan drawdowns begin. Confirm this early with your preferred demolition company and lender or broker so you can plan your budget and avoid delays between demolition and the start of your new home build.

Is my Sydney block suitable for a knock down rebuild?

Many Sydney blocks are suitable for a knock down rebuild, but every site needs to be assessed before you commit. The size, shape, slope, access and planning controls on your land can all affect what can be built.

Your block may be suitable if:

  • The existing home can be safely demolished

  • The block has enough width and depth for your preferred home design

  • The site allows safe access for demolition and construction

  • The slope can be managed with the right home design

  • Stormwater, sewer and service connections can be planned properly

  • Trees, pools, retaining walls or old structures can be assessed

  • Easements, setbacks and council requirements have been checked

  • The block suits your budget, lifestyle and long-term plans

A site inspection is the best place to start. Montgomery Homes can assess your Sydney block and help you understand which home designs may suit your land.

What building approvals do I need for a knock down rebuild in Sydney?

A knock down rebuild in Sydney will usually need approval through either a Development Application (DA) or a Complying Development Certificate (CDC).

  • A DA is assessed by your local council. This pathway is often needed when your new home requires a more detailed planning review, or when the design does not meet CDC requirements.

  • A CDC is a faster approval pathway for straightforward projects that meet set NSW planning standards. It combines planning and construction approval and can be assessed by the council or an accredited certifier.

As a guide, CDC approvals can be issued in as little as 20 days when all requirements are met. DA timeframes can vary depending on your council, site conditions, design complexity and whether extra information is requested.

Montgomery Homes will take care of the approval process for your new home. All you need to do is confirm how demolition approval will be handled, as it may require a separate approval or be included as part of the broader application.

Site Suitability

Where in Sydney do you build?

We offer our knock down rebuild services throughout Sydney, from the Northern Beaches to the CBD and even as far west as the Blue Mountains and south to Wollongong and the Illawarra. We also offer services in Newcastle, the Hunter Valley, and the Central Coast!

Can I choose any home from the Montgomery Homes collection?

The right home design will depend on the size and slope of the land. For example, if you have a narrow block, our team will recommend designs from our narrow home design collection. Likewise, if land has a challenging slope, we might recommend a split-level home design to make the most of the land. We’ll help you choose the right home design for the unique challenges of your property. You can choose the facade theme, the internal and external colours, and more! We’ll be with you through the entire process, so you can rest assured knowing you’ll receive the brand new home you’ve been dreaming of.

Meet Terry and Katrina

Knock Down Rebuild for a growing family

Twenty five years after building their first Montgomery Home, Terry and Katrina knew they'd found their forever suburb, close to friends, family and great neighbours, with a lifetime of memories raising their kids. As their children grew into teenagers, the family needed more space, so they set their sights on a new block in the same much loved suburb. Rather than leave the neighbourhood behind, Terry and Katrina chose to knock down and rebuild, creating a brand new home right where they belonged.

Terry and Katrina — growing and expanding with Montgomery Homes

Testimonials

Knock Down Rebuild Sydney

"The process was great. I was happy with the communication and updates. My new home is amazing, highly recommend Montgomery Homes. I can’t wait to start our new chapter in our forever home."

Gina C

Knock Down Rebuild Sydney

A great result – our supervisor, (Colin), communicated clearly and in a timely manner. This meant the process was easy and we have a house we are very pleased with. We would recommend Colin and Montgomery.

Grant

Knock Down Rebuild Sydney

"Happy from the very first stage to the very end, it has been a breeze... The quality of the build is perfect and a big thank to my Site Supervisor who always kept me up-to-date with the progress. Overall, I'm extremely happy I chose Montgomery. Thank you for everything, it is truly beautiful and we love it!"

Ingrid, Hunter Region

Knock Down Rebuild Sydney

“Very professional, made building a home easy and trouble free. Very much appreciated”

Ridley, The Entrance North

Knock Down Rebuild Sydney

“Easy, friendly, stress-free, professional team! Kyle has exceptional organisational skills!! Would definitely build with Montgomery again ☺”

Sexton, Raworth

Knock Down Rebuild Sydney

“We are really impressed by the process / system you have in place to keep your clients up to speed with what to expect and what the progressive steps are during the entire process. i.e. from initial signing through to handover and everything required during. We have built before with other builders and genuinely feel that this process and the people we’ve dealt with made building with Montgomery Homes a step well above what we have experienced before.”

Venn, July 2020, Eleebana

Build the home you've always imagined with Montgomery Homes

From your first conversation to the final handover, Montgomery Homes is here to guide you through every step of the journey with thoughtfully designed homes tailored to your lifestyle.